Planning a Paint Job

How Long Does It Take to Paint a Room?

An average bedroom with ceiling, walls and trims usually takes one to two days. The painting itself is quick; preparation and waiting for each coat to dry take most of the time.

Man using a roller on an extension pole to paint the upper part of a yellow wall in a room with louvre windows and floral curtains

For a standard bedroom with a ceiling, four walls, a door and skirtings, plan on one to two days. The rolling and brushwork might only add up to a few hours. The rest of the time is taken by moving and covering furniture, preparing the surfaces, and waiting for each coat to be ready for the next. Understanding where those hours go makes it much easier to plan around a paint job.

Where the time actually goes

Most rooms follow the same sequence, and each step has its own clock:

  1. Setting up: furniture to the centre, floors covered, switch plates and fittings removed.
  2. Preparation: washing marks, filling holes and cracks, sanding the filler flush, gap filling along skirtings and architraves.
  3. Priming or sealing: spot priming patches and stains, or sealing a full wall if it is new or bare.
  4. Ceiling coats: usually two.
  5. Wall coats: usually two, cut in and rolled.
  6. Trims and door: undercoat if needed, then enamel.
  7. Pack up: fittings back on, furniture back, a final check in good light.

Fillers need to dry hard before they can be sanded, and deep fills sometimes need a second application because they shrink as they dry. That waiting is why preparation can easily take as long as the painting. We explain why that time is worth spending in our piece on why preparation is most of a paint job.

Drying and recoat times

Water based acrylic wall paint is typically touch dry in under an hour or two, but touch dry is not the same as ready to recoat. Most wall and ceiling paints suggest somewhere in the region of two to four hours before a second coat in mild conditions. Water based enamels on trims often want longer, and solvent based enamels can need overnight. Always check the tin, because these figures differ between products.

Those recoat gaps are the real reason a room spreads over two days. A painter can do the ceiling, move to the walls while it dries, come back for a second ceiling coat and so on, but there is only so much juggling possible in a single room. For more on what happens after the last coat, see how long paint takes to dry and cure.

What makes a room take longer

  • Repairs. Cracked cornices, old anchor holes, peeling patches or water stains all need attention before any colour goes on.
  • Big colour changes. Going from a deep colour to a pale one can mean a tinted undercoat and three topcoats instead of two.
  • New or bare surfaces. Fresh plasterboard or bare timber needs a sealer or primer first, which is a whole extra coat.
  • High ceilings. The ornate, tall ceilings in older Adelaide villas need trestles or a platform, and moving them around takes time.
  • Lots of joinery. Panelled doors, deep skirtings and picture rails are slow, careful brush work.
  • Furniture that cannot move. Working around a built in desk or a heavy wardrobe is slower than painting an empty room.

Weather plays a part even indoors

Paint dries by water evaporating, so the air in the room matters. On a dry, warm Adelaide day with a window open, acrylic dries quickly. In the middle of a cold, damp July week, the same paint can take noticeably longer to be ready for its next coat, and a careful painter waits rather than rolling a second coat over a soft first one. Running heating to speed things along is fine within reason, but blasting hot air directly onto a wall can make it dry too fast at the surface.

On very hot days the opposite problem applies. Paint can start to set before you have finished rolling a wall, which leaves lap marks. Working early in the day and keeping the room shaded helps.

A whole house is not just rooms multiplied

When several rooms are painted together, the drying time in one room is used to work in another, so the total is less than adding each room up separately. A crew can also stage the house so bedrooms are usable at night and the kitchen is only out of action for a short window. That is why a schedule for a full interior is best worked out at a site visit, looking at the actual rooms rather than estimating from a floor plan.

If you are planning a repaint and want to know how long your home will realistically take, our interior painting team can walk through it with you and give you a timetable along with the quote.

Keep reading

Related guides

All articles

Free quotes

Want it done properly, first time?

Prefer to leave it to the professionals? We quote every job free, after a site visit.

Call us Free quote